Tag: Colocation
-
The Bank of England has asked lenders about UK data centre loans made before a tenant is signed, as scrutiny of AI-linked debt grows.
-
Telehouse and KDDI buy London Docklands site for £220m+ with 65 MVA for an AI-ready colocation data centre. What it means for edge and modular in the UK.
-
Magnora Data Center and Blix Group have bought an operating 2MW data centre in Oslo from a telecom operator, the third site in a metro edge strategy.
-
NorthC has started work on a modular 4.5MW data centre in Meyrin, Geneva, built in 1.5MW steps with waterless cooling and heat reuse, due in 2028.



