Tag: Liquid cooling
-
IREN has a civil works licence and grid-connected power for a 300MW sovereign AI campus in Badajoz, Spain, with first operations targeted for 2028.
-
NorthC has started work on a modular 4.5MW data centre in Meyrin, Geneva, built in 1.5MW steps with waterless cooling and heat reuse, due in 2028.
-
Polar will use Vertiv prefabricated modules for a 41MW AI phase at Herøya and adds a 40MW hydro-powered Crusoe site at Tørdal, due late 2027.


