Tag: Norway
-
Magnora Data Center and Blix Group have bought an operating 2MW data centre in Oslo from a telecom operator, the third site in a metro edge strategy.
-
Polar will use Vertiv prefabricated modules for a 41MW AI phase at Herøya and adds a 40MW hydro-powered Crusoe site at Tørdal, due late 2027.

