Tag: Modular data centres
-
Yexio, backed by Hochtief PPP Solutions and Palladio Partners, has opened a 2MW timber-built edge data centre in Bad Lippspringe, its second site.
-
A Schneider Electric and Omdia survey finds 55% of enterprises prefer company-owned, on-premises AI infrastructure, citing privacy and compliance.
-
CTS Group and Eaton’s Nordic EPOD opens a €50m factory in Viana do Castelo, Portugal, building prefabricated power modules for European data centres.
-
Polarise plans around 150MW of new AI capacity in Germany by 2028, fitting modular AI pods into existing buildings in Bavaria, Hesse and NRW.
-
Vertiv Q3 2026 results: sales up 61%, orders double, EMEA up 19% organically. What it means for prefabricated modular and edge data centres in Europe.
-
London-based RHAELM will pay Workhorse $10m for a TerraPod spec unit and has a non-binding letter of intent for 150 factory-built data centre systems.
-
NASK says Poland’s PLN 1.6bn National Data Processing Centre will be built in modules from 15MW, with server heat reuse and hydrogen back-up plans.
-
Spain’s revised draft data centre decree raises the threshold from 1MW to 10MW and eases renewable-matching rules, sparing most edge and modular sites.
-
Era4 plans to install modular data centre units inside an unused building at a former Newport steelworks, with a first stage due online in 2027.
-
NorthC has started work on a modular 4.5MW data centre in Meyrin, Geneva, built in 1.5MW steps with waterless cooling and heat reuse, due in 2028.









